title · Materials Check

Materials. At the moment of execution.

This is what catches most installation and service plans out, so we check it. If the parts won't be there on the day, you find out now, before the truck leaves. The check looks at on-hand stock, inbound POs, reservations, inter-location transfers and any planned replenishment, such as production or assembly orders. And if the order that would supply the parts doesn't exist yet, we calculate the lead time it would need.

Component-level check at slot time
Bill of materials resolved to stocked items. Each component checked against availability on the activity date — not just today.
Inbound and transfer aware
A PO due Wednesday makes parts usable from Wednesday — or the day after, depending on your settings. Inter-warehouse transfers are counted on their landing date too.
Counts the replenishment that has to happen
If parts need producing or ordering, the check folds in that lead time — and if no order exists yet, it calculates what one would take.
Cosa vedi

A check that prevents a truck roll.

Field service is a calculus of trucks. A missed truck is a half-day of lost productivity, a lost callout fee, and a frustrated customer. Material availability is the single most common cause of a missed truck. Checking it in advance is operational money.

  • BOM-aware availability check per activity
  • On-hand, inbound, transfer and reservation aware
  • Shortages surfaced in planning, never on the truck
uScheduler P/S/S, immagine 2
Quando conta

Segnali che ti serve.

01
Truck rolls without a key part
The engineer drives an hour, opens the box, finds the wrong filter. A pre-check would have caught it before the truck left.
02
Sales sells what isn't in stock
A customer ordered a part-included install. The part was on backorder. Nobody told anyone.
03
Substitutes happen on the floor
When part A is short, the engineer picks part B because "it should work". Without a substitute rule, the install is a future warranty claim.
04
Inter-warehouse transfers are forgotten
A part in warehouse 2 is usable in region 1 if a transfer is scheduled. Without the transfer in the plan, the part is invisible.
FAQ

Le domande che tutti fanno per prime.

Hai ancora dubbi? Chiedicelo direttamente →

Each engineer's van is modelled as a location. Van stock is on-hand stock for that engineer's activities. The replenishment policy is set on that location itself.