OPEXIS
Delivery, Project & Service Planning

uScheduler Project / Service / Sales

One plan for everything that happens after production.

Once production is done, there's still delivery, installation, service and project work to plan. uScheduler P/S/S puts all of it in one overview and plans it against capacity, skills, geography, deadlines and material availability. It also checks whether the parts will be there on the day. Sales, logistics and engineers all look at the same board, so promises get kept and there are fewer surprises.

uScheduler P/S/S planning board with project and service orders scheduled across resources
Funcionalidades · 9
uScheduler P/S/S · Routing & Geography

Routes that respect the map.

When a day's plan includes six addresses, the order matters. uScheduler proposes a route that minimises travel, taking traffic and access windows into account and starting from the engineer's home base. The saving is shown in time.

Daily route optimisation
Per engineer, per day. The algorithm proposes a sequence that minimises drive time; the planner can pin certain visits to certain times before re-optimising.
Home base in, home base out
Routes start and end at each engineer's home or depot, so the first and last drive of the day are part of the plan — not an afterthought.
Travel savings, measured
After each optimisation, the drive time saved versus the prior order is shown. Boring planning becomes visibly valuable.
Lo que ves

A route is a real number.

A field-service business that ignores routing leaks its scarcest resource: productive time. Every extra hour on the road is an hour not spent on a job. A 12% reduction in drive time on a team of 20 engineers is roughly 2 full FTEs of capacity recovered — without hiring.

  • Map-aware route building per engineer per day
  • Traffic-time estimates per time-of-day
  • Home base and end-of-day return modelled
  • Pinned visits keep their slot during re-optimisation
uScheduler P/S/S, imagen 2
Cuándo importa

Señales de que lo necesitas.

01
Engineers build their own routes
When the planner gives a flat list, engineers triage by gut. The result is uneven and unverifiable.
02
Two engineers drive past each other
Different jobs, same neighbourhood, no co-ordination. A simple cross-engineer check ends this.
03
Nobody owns the drive time
Travel between jobs is treated as free. It isn't. It's the biggest chunk of unbillable time in the day, and it never shows up in the plan.
04
Wasted drive time hides the bill
When routes are sloppy, the cost shows up as hours lost on the road. It looks like "the cost of doing business" until somebody charts it.
FAQ

Las preguntas que todos hacen primero.

¿Aún tienes dudas? Pregúntanos directamente →

Google Maps.

Mira uScheduler P/S/S en una demo de 30 minutos.

Una pantalla compartida real con alguien que la creó. Sin diapositivas.

La suite uTools

Otras aplicaciones que combinan bien con uScheduler P/S/S